Sustainable solutions for a cleaner tomorrow

Established in 2004, Samyak Metals Private Limited is one of the leading manufacturers of Aluminium Alloys (Ingots & Liquid) & Stainless Steel of different grades and specifications as per the stringent national and international standards.

Subscribe & Follow

Infrastructure

Infrastructure

At Samyak Metals, a technology-focused approach has fueled our growth. Continual technical upgradation is a continuous process, embedded in the Samyak Metals way of working. The plant is well equipped with modern equipment for manufacturing, testing and finishing of material. The imported and locally procured scrap is segregated with the help of a Magnetic Separator and visual inspection before it is put into the furnance for melting .The material is tested during the process at various stages with a spectrometer under the guidance of a qualified and experienced Metallurgist. Necessary addition and alteration are made in the inputs to ensure that finished product meets the requirements of the customer’s specifications.

S No. Machine Name Machine No. Make Capacity Location Year of Installation
1 MELTING FURNACE - A MF -01 ENTEC 7 MT PRODUCTION 15.03.2019
2 MELING FURNACE - B MF -02 ENTEC 7 MT PRODUCTION 16.04.2019
3 CHARGER MACHINE - A/B CM -01 DURG MANGLUM 1 TON PRODUCTION 21.05.2019
4 HORIZINTAL CASTOR  -A/B HC -01 ENTEC 250 Mould PRODUCTION 17.04.2019
5 MELTING FURNACE  - C MF -03 REDINT 10 MT PRODUCTION 16.05.2023
6 SCISSOR LIFT  - 1st SL -01 SCISSOR 2 TON PRODUCTION 20.10.2019
7 MELTING FURNACE  - D MF 04 ENTEC 8MT PRODUCTION 15.06.2020
8 CHARGER MACHINE - D CM -02 DURG MANGLUL 1 TON PRODUCTION 27.07.2020
9 HORIZINTAL CASTOR  - D HC -02 ENTEC 220 Mould PRODUCTION 25.05.2020
10 MELTING FURNACE - H MF -05 REDAINT 10 MT PRODUCTION 12.06.2022
11 SCISSOR LIFT 2ND SL - 02 SCISSOR 2 TON PRODUCTION 13.04.20
12 CHARGER MACHINE  -H CM -03 DURG MANGLUM 1 TON PRODUCTION 20.05.2022
13 HORIZINTAL CASTER - H HC -03 ENTEC 250 Mould PRODUCTION 21.05.2022
14 LADDLE PRE E HEATER-1 LP -01 COINTINENTAL 5 HP PRODUCTION 05.05.2019
15 LADDLE PRE E HEATER- 2 LP -02 COINTINENTAL 5 HP PRODUCTION 05.05.2019
16 LADDLE PRE E HEATER-3 LP -03 COINTINENTAL 5 HP PRODUCTION 08.06.2020
17 LADDLE PRE E HEATER-4 LP 04 COINTINENTAL 5 HP PRODUCTION 10.05.2021
18 DEGESSING MEACHINE     -01 DE -01 ALL CAST PRODUCTION 20.05.2020
19 VACCUM MACHINE             -01 VM   -01 Promiment Vacumm Testing PRODUCTION 20.05.2020
20 FLUX MACHINE                    -01 FF  -01 F.S INTERNATIONAL PRODUCTION 18.03.2021
21 FLUX MACHINE                    -02 FF  -02 F.S INTERNATIONAL PRODUCTION 18.03.2021
22 LADDEL   -01 RUNING VEHICAL EIF 1 TON RAW MATRIAL 06.05.2019
23 LADDEL   -02 RUNING VEHICAL EIF 1 TON RAW MATRIAL 06.05.2019
24 LADDEL   -03 RUNING VEHICAL EIF 1 TON RAW MATRIAL 10.10.2019
25 LADDEL   -04 RUNING VEHICAL EIF 1 TON RAW MATRIAL 10.10.2019
26 LADDEL   -05 RUNING VEHICAL EIF 1 TON RAW MATRIAL 11.10.2019
27 LADDEL   -06 RUNING VEHICAL EIF 1 TON RAW MATRIAL 09.02.2020
28 LADDEL   -07 RUNING VEHICAL EIF 1 TON RAW MATRIAL 11.02.2020
29 LADDEL   -08 RUNING VEHICAL EIF 1 TON RAW MATRIAL 12.02.2020
30 LADDEL   -09 RUNING VEHICAL EIF 1 TON RAW MATRIAL 03.04.2020
31 LADDEL   -10 RUNING VEHICAL EIF 1 TON RAW MATRIAL 05.04.2020
32 LADDEL   -11 RUNING VEHICAL EIF 1 TON RAW MATRIAL 10.04.2020
33 LADDEL --12 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 10.05.2020
34 LADDEL --13 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 05.04.2023
35 LADDEL --14 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 05.04.2023
36 LADDEL --15 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 8.01.2023
37 LADDEL --16 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 8.01.2023
38 LADDEL --17 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 18.05.2024
39 LADDEL --18 RUNING VIHICAL FURNTECH 1 TON RAW MATRIAL 15.11.2024
40 E.O.T CRANE  -01 E.T. - 01 ROSY 5 TON DISPATCH 12.08.2019
41 E.O.T CRANE   -02 E.T. - 02 ROSY 2 TON DISPATCH 05.03.2020
42 BAG HOUSE BH-01 AlphaTherm 75KW UTILITY 27.05.2019
43 DISHINDECTOR DM -01 S.S FORGING RAW MATRIAL ( TT AERA) 22.06.2020
44 COMPRESSOR  1 st CO -1 ELGI 11 KW UTILITY 20.06.2020
45 COMPRESSOR  2nd CO -2 Air Touch 5 KW UTILITY 13.04.2019
46 COMPRESSOR  3rd CO -3 Air Touch 4 KW UTILITY 14.05.2019
47 WASHING TABLE - 01 WASHING 01 BHUPENDAR M/C 4 Ton RAW MATRIAL 30.05.2019
48 WASHING TABLE - 02 WASHING 02 BHUPENDAR M/C 4 Ton RAW MATRIAL 31.05.2019
49 WASHING TABLE - 03 WASHING 03 BHUPENDAR M/C 4 Ton RAW MATRIAL 15.05.2023
50 WASHING TABLE - 04 WASHING 04 BHUPENDAR M/C 4 Ton RAW MATRIAL 15.05.2023
51 WASHING CONVEYOR  -01 WC01 BHUPENDAR M/C RAW MATRIAL 14.03.2019
52 WASHING CONVEYOR  -02 WC02 BHUPENDAR M/C RAW MATRIAL 15.04.2019
53 WASHING CONVEYOR  03 WC03 BHUPENDAR M/C RAW MATRIAL 18.04.2019
54 WASHING CONVEYOR  04 WC04 BHUPENDAR M/C RAW MATRIAL 14.04.2019
55 WASHING CONVEYOR  05 WC05 BHUPENDAR M/C RAW MATRIAL 13.05.2019
56 WASHING CONVEYOR  06 WC06 BHUPENDAR M/C RAW MATRIAL 11.04.2019
57 WASHING CONVEYOR  07 WC07 BHUPENDAR M/C RAW MATRIAL 12.04.2019
58 INTEGRATED ROTERY SCIIVE ZORBA   -001 BHUPENDAR M/C RAW MATRIAL 15.04.2019
59 INCLIND  CONVEYOR  -01 ZORBA   -01 BHUPENDAR M/C RAW MATRIAL 17.04.2019
60 INCLIND  CONVEYOR  -02 ZORBA   -02 BHUPENDAR M/C RAW MATRIAL 20.04.2019
61 INCLIND  CONVEYOR  -03 ZORBA   -03 BHUPENDAR M/C RAW MATRIAL 18.04.2019
62 INCLIND CONVEYOR   -04 ZORBA   -04 BHUPENDAR M/C RAW MATRIAL 19.04.2019
63 INCLIND CONVEYOR   -05 ZORBA   -05 BHUPENDAR M/C RAW MATRIAL 20.04.2019
64 INCLIND CONVEYOR   -06 ZORBA   -06 BHUPENDAR M/C RAW MATRIAL 22.05.2019
65 INCLIND CONVEYOR   -07 ZORBA   -07 BHUPENDAR M/C RAW MATRIAL 24.05.2019
66 INCLIND CONVEYOR   -08 ZORBA   -08 BHUPENDAR M/C RAW MATRIAL 26.05.2020
67 PLATE FROM CONVEYOR   -01 ZORBA   -01 BHUPENDAR M/C 20 Ton RAW MATRIAL 27.05.2020
68 PLATE FROM CONVEYOR   -02 ZORBA   -02 BHUPENDAR M/C 20 Ton RAW MATRIAL 28.05.2020
69 PLATE FROM CONVEYOR   -03 ZORBA   -03 BHUPENDAR M/C 20 Ton RAW MATRIAL 28.05.2020
70 BALLING  MACHINE  1ST. BL-01 ADVANCE HYD.TECH PVT.LTD 8 TON RAW MATRIAL 14.04.2020
71 BALLING  MACHINE  2ND. BL-02 ADVANCE HYD.TECH PVT.LTD 8 TON RAW MATRIAL 29.02.2024
72 D. G.   -01 D.G. -01 COMMINIS 382 KW UTILITY 25.05.2019
73 D. G.   -02 D.G. -02 COMMINIS 82.5 KW UTILITY 28.05.2019
74 FORK LIFT    -01 ( SOLD OUT) 30.06.2024 SMD  -01 TOYATA 3 TON RAW MATRIAL 31.01.2019
75 FORK LIFT    -02 ( SOLD OUT) 30.06.2024 SMD  -02 TOYATA 3 TON RAW MATRIAL 05.08.2019
76 FORK LIFT    -03 SMD  -03 TOYATA 3 TON RAW MATRIAL 13.07.2020
77 FORK LIFT    -04 SMD  -04 TOYATA 3 TON RAW MATRIAL 14.07.2020
78 FORK LIFT    -05 SMD  -05 TOYATA 3 TON RAW MATRIAL 2904.2021
79 FORK LIFT    -06 SMD  -06 TOYATA 3 TON RAW MATRIAL 30.11.2021
80 FORK LIFT    -07 SMD  -07 TOYATA 3 TON RAW MATRIAL 23.01.2023
81 FORK LIFT    -08 SMD  -08 TOYATA 3 TON RAW MATRIAL 24.08.2023
82 FORK LIFT    -09 SMD  -09 TOYATA 3 TON RAW MATRIAL 08.007.2024
83 FORK LIFT ( ELECTRICIAL ) 10 SME-10 BYD 3 TON RAW MATRIAL 27.09.2024
84 FORK LIFT ( ELECTRICIAL ) 11 SME-11 BYD 3 TON RAW MATRIAL 24.08.2023
85 FORK LIFT ( ELECTRICIAL ) 12 SME-12 BYD 3 TON RAW MATRIAL 08.007.2024
86 LODDALL   1st LD -01 J.C.B 1 Ton RAW MATRIAL 15.03.2020
87 LODDALL   2nd Ld  -2 J .C. B 1 Ton RAW MATRIAL 16.09.2022
88 TRACTOR TC -01 FARMTRAC 60 HP RAW MATRIAL 13.05.2020
89 WELDING M/ACHINE   -01 WM  01 JMT MAINT. UTILITY 12.04.2019
90 WELDING M/ACHINE   -02 WM  02 JMT MAINT. UTILITY 13.04.2019
91 WELDING M/ACHINE   -03 WM  03 JMT MAINT. UTILITY 13.04.2019
92 WELDING M/ACHINE   -04 WM  04 JMT MAINT. UTILITY 14.05.2019
93 WELDING M/ACHINE   -05 WM  05 JMT MAINT. UTILITY 15.05.2019
94 WELDING M/ACHINE   -06 WM  016 JMT MAINT. UTILITY 15.05.2019
95 POLISHING MACHINE PM  -01 JMT Q/A 15.08.2020
96 CUTTING MACHINE CM  -01 JMT Q/A 15.08.2020
97 DUCTING SYSTEM DS-01 MAINT. UTILITY 10.05.2020
98 TRANSFORMER TR-01 ATS MAINT. UTILITY 10.05.2019
99 L.T.PANNEL LT-01 APC MAINT. UTILITY 10.05.2019
100 FIRE HYDRENT FH-01 MAINT. UTILITY 21.04.2020
101 IDSM MACHINE IDSM 01 Techno -Commereial Proposal PRODUCTION DROSS 07.05.2024

Our Customers

image
image
image
image
image
image
image